Key takeaways

  • A UK residential park home is built on a steel chassis, then framed, insulated and clad in a factory, not assembled on site brick by brick.
  • Every home sold as a residential park home has to meet BS3632, currently the 2023 revision. Holiday lodges and static caravans are usually built to the lighter EN1647 standard instead.
  • The law sets a hard size limit too. A twin-unit caravan cannot exceed 20 metres long, 6.8 metres wide and 3.05 metres high once assembled, under the Caravan Sites Act 1968 as amended.
  • Factory build typically runs 10-12 weeks. Getting the finished home onto its plot, connected and skirted usually adds a few more weeks on top.
  • Ask for the Manufacturer's Declaration of Compliance before you buy. It tells you which standard the home was actually built to.

Ever wondered how a park home goes from a flat steel frame to the finished property you view on a park? The process is closer to aircraft manufacture than traditional housebuilding: built indoors, to a fixed specification, then delivered whole.

What actually counts as a park home, legally

A park home is not defined by how it looks. It is defined by law as a type of caravan. Under the Caravan Sites Act 1968 (as amended), a twin-unit caravan, the two-section design most park homes use, cannot exceed 20 metres in length, 6.8 metres in width and 3.05 metres in internal height once assembled on site. Go over any of those figures and the structure stops counting as a caravan in law, whatever it looks like from the outside.

That size cap is also what allows a park home to be built in two halves in a factory, towed to site on two separate loads, then joined together on the plot. A conventional house cannot be delivered that way. A park home is built to be.

The build, step by step

1. Chassis. Everything starts with a steel frame: two main channel beams running the full length of the home, roughly 300mm deep, with a welded steel ladder frame above for support. Wheels are fitted so the shell can move around the factory and later onto the transporter; axle stands take over once it's sited.

2. Floor. Timber joists bolt to the chassis, insulation goes between them (fibre wool or rigid polystyrene is typical, chosen partly to protect the pipework running through the floor void), then a dense tongue-and-groove board, often around 18mm thick, is screwed and nailed down as the deck.

3. Walls. Timber studwork goes up next, with roughly 140mm of fibre wool insulation packed into the cavity. Plasterboard or MDF lines the inside. Outside, the cladding is largely a style choice: painted stucco, timber tongue-and-groove, or a low-maintenance composite board like CanExel.

4. Roof. Trussed rafters span the walls, topped with lightweight metal roofing tiles and 200-250mm of mineral wool insulation underneath, considerably deeper than the wall insulation, since heat loss through a roof is disproportionate. Trussed construction also means a manufacturer can offer a vaulted ceiling as easily as a flat one.

5. Fit-out. With the shell weathertight, electricians and plumbers first-fix the wiring and pipework, then the interior goes in: kitchen units, bathroom fittings, flooring, and any bespoke touches a buyer has specified, from an ensuite layout to a particular finish on the kitchen units.

6. Inspection. Before a home leaves the factory, it's checked against the standard it was built to. A home built by an NCC (National Caravan Council) member goes through self-certification, testing and inspection, and should leave the factory with a Manufacturer's Declaration of Compliance and an NCC badge.

Getting it onto your plot

A park home usually travels in two halves, each around 10 feet wide, on separate low-loaders, with the route agreed with police in advance for anything oversized. On arrival, the two sections are lowered into position on the plot and jacked level so they can be joined and finished.

From there, it's a case of connecting up rather than building from scratch: electrics and plumbing are finished and certified, a bricklayer builds the skirting between the chassis and the ground and lays any entrance steps, and the two halves are sealed together into a single home. Transport and siting itself usually takes a couple of days. Getting from delivery to a home with keys in hand, fully connected, skirted and signed off, typically takes a few weeks longer.

BS3632 or EN1647? Check which one your home is built to

BS3632 (residential) EN1647 (holiday)
Built for full-time, year-round living, subject to the site's licence Built for seasonal holiday use only
Higher insulation and ventilation specification to cope with a full winter Lighter specification, since the home isn't expected to be occupied through the coldest months
Current revision: BS3632:2023 A separate European standard, not a lighter version of BS3632

Every residential park home should be built to BS3632. Static caravans and most holiday lodges are built to EN1647 instead, though some newer lodges are built to BS3632 anyway if the site carries a 12-month licence. Build standard and site licence are two different things, and one doesn't guarantee the other, so check both. We've covered exactly what BS3632 involves, including the 2023 changes to insulation and fire safety, in a dedicated guide to the BS3632 standard.

How long do park homes last?

Manufacturers typically talk about a lifespan of 60-80 years with proper maintenance, though the figure depends heavily on upkeep, the manufacturer, and the specific model, so treat it as a guide rather than a guarantee. A new home also comes with a manufacturer's warranty, which is the more reliable number to check for your particular purchase; ask what it covers and for how long before you buy.

Ask for the Declaration of Compliance before you commit to a home, not after. It takes two minutes and tells you exactly what standard the home was built to, which matters far more than how it looks in a listing photo.

— Justin Allitt, Sell My Group

Frequently asked questions

What's the difference between a park home and a static caravan, structurally?
Both use a similar steel chassis and timber-frame construction. The difference is mainly the standard they're built to and the specification that comes with it. A park home built to BS3632 carries a heavier insulation and ventilation spec for year-round living; a static caravan built to EN1647 doesn't need to, since it's designed for seasonal use.

Does every park home meet BS3632?
No. Only homes built and marketed as residential park homes should carry BS3632 certification. Always ask for the Manufacturer's Declaration of Compliance rather than assuming from how a home looks or is described.

How long does it take to build a park home?
Factory build typically runs 10-12 weeks from confirmed specification to completion, though this varies by manufacturer and how bespoke the specification is. Transport and siting on the plot adds a further period on top, usually a few weeks to get fully connected and finished.

Can I customise the build of my park home?
Yes. Most manufacturers let buyers specify layout, kitchen and bathroom fittings, flooring and cladding before the build starts. Changes get harder and more expensive to make once the shell is built, so agree the specification early.

What size is a park home legally allowed to be?
Under the Caravan Sites Act 1968 as amended, a twin-unit caravan cannot exceed 20 metres in length, 6.8 metres in width and 3.05 metres in internal height once assembled.

Do older park homes meet the current BS3632 standard?
No, and they don't need to. A home is compliant with whichever version of the standard was current when it was built. An older home isn't reclassified when the standard is revised, though its insulation and specification will reflect the standard of its build year.